Location
New Westminster, British Columbia
Client
Modern Niagara
Consultant
Stantec
Contract Type
Design-Build
Project Size
20,800m2 [223,889 ft2]
Services Utilized
- Steam CRN Registration and Piping Design
- Seismic Restraint Design for all Mechanical Equipment, HVAC ducting, Plumbing, Hydronic Systems, Medical Gas, and Steam Piping
- Steel support frame design for equipment and all flue gas venting
- 3D Point Cloud Scanning
Phase one prepared the hospital’s infrastructure for the expansion of bed capacity planned in phase two. The phase one scope included:
- A new 75-bed mental health and substance use wellness center with new and expanded outpatient clinics, Fraser Health’s first older adult psychiatric unit, and a psychiatric high acuity unit, all to replace the aging 30-bed Sherbrooke Centre
- A new energy center to replace the aging power plant and tie into the city’s future district energy center
- New parking including a 450+ stall underground parkade plus a temporarily expanded visitor lot onsite, and a temporary offsite lot for employees